Complete Service Catalog

Regulatory Compliance & Testing Services

From mandatory BIS ISI marks and foreign factory inspections (FMCS) to electronics CRS, telecom TEC, wireless WPC, and CPCB EPR schemes.

Product Certification & Regulatory Licensing

BIS ISI Mark, FMCS, CRS, Scheme-X, Hallmark, WPC, TEC, BEE, CDSCO & EPR licensing.

BIS ISI Mark
Most Popular

ISI Certification (Domestic Manufacturers)

Obtain ISI mark certification under BIS Scheme-I for Indian domestic manufacturers ensuring compliance with Indian Quality Standards.

Timeline: 30 - 45 Working Days
Standards: IS 15844 (Footwear), IS 302 (Appliances)...
View Detailed Requirements
BIS FMCS Scheme
Overseas Plants

Foreign Manufacturers Certification Scheme (FMCS)

End-to-end BIS certification for overseas manufacturing units exporting notified products to the Indian market.

Timeline: 60 - 90 Working Days
Standards: Mandatory Indian Standards covering Elec...
View Detailed Requirements
BIS CRS (Electronics)
IT & Electronics

BIS CRS Registration (Electronic & IT)

Compulsory Registration Scheme (CRS) under MeitY for IT goods, consumer electronics, solar inverters, and battery packs.

Timeline: 15 - 25 Working Days
Standards: IS 13252 (IT Goods), IS 616 (Audio/Video...
View Detailed Requirements
BIS Scheme-X
Heavy Equipment

BIS Scheme-X Certification (Machinery & Heavy Industry)

Conformity assessment scheme tailored for complex machinery, transformers, industrial assemblies, and capital equipment.

Timeline: 40 - 60 Working Days
Standards: Heavy Industry Machinery, Pumping Units,...
View Detailed Requirements
BIS Hallmark
Precious Metals

BIS Hallmark Registration (Gold & Silver)

Mandatory BIS Hallmarking registration for jewelers, bullion dealers, and Assay & Hallmarking Centers (AHCs).

Timeline: 7 - 12 Working Days
Standards: IS 1417 (Gold & Gold Alloys), IS 2112 (S...
View Detailed Requirements
Management Systems
Enterprise QMS

Management System Certification (ISO Standards)

Certification and auditing for ISO 9001 (QMS), ISO 14001 (EMS), ISO 45001 (OH&S), and ISO 27001 (ISMS).

Timeline: 15 - 30 Working Days
Standards: ISO 9001:2015, ISO 14001:2015, ISO 45001...
View Detailed Requirements
WPC ETA Approval
Wireless & RF

WPC ETA Approval (Wireless Planning & Coordination)

Mandatory Equipment Type Approval (ETA) from DoT for wireless, Bluetooth, and Wi-Fi devices in de-licensed frequency bands.

Timeline: 5 - 10 Working Days
Standards: 2.4 GHz, 5 GHz, RFID, Bluetooth 5.0+, Zi...
View Detailed Requirements
TEC Certification
Telecom MTCTE

TEC Certification (MTCTE Telecom Equipment)

Mandatory Testing and Certification of Telecom Equipment (MTCTE) issued by Telecommunication Engineering Centre (TEC) India.

Timeline: 20 - 35 Working Days
Standards: Essential Requirements (ER) for Routers,...
View Detailed Requirements
BEE Star Rating
Energy Efficiency

BEE Star Rating & Energy Labelling

Bureau of Energy Efficiency (BEE) Star Rating and Standards & Labelling registration for consumer appliances and industrial motors.

Timeline: 20 - 30 Working Days
Standards: Mandatory & Voluntary BEE appliances: AC...
View Detailed Requirements
CDSCO Medical Devices
Medical Devices

CDSCO Registration (Medical Devices & IVDs)

Regulatory licensing under Medical Device Rules (MDR) 2017 for Class A, B, C, and D medical devices and in-vitro diagnostics.

Timeline: 30 - 60 Working Days
Standards: MDR 2017, ISO 13485, Device Master File ...
View Detailed Requirements
EPR Registration (CPCB)
CPCB Environmental

EPR Registration (CPCB Plastic & E-Waste)

Extended Producer Responsibility (EPR) registration with Central Pollution Control Board (CPCB) for PIBOs for plastic packaging, e-waste, battery, and tyre recycling.

Timeline: 15 - 25 Working Days
Standards: Plastic Waste Management Rules 2016 & E-...
View Detailed Requirements
BIS Toys Certification
Mandatory QCO

BIS Certification for Toys (Safety of Toys)

Mandatory BIS ISI Mark certification for electric and non-electric toys under the Toys (Quality Control) Order.

Timeline: 30 - 45 Working Days
Standards: IS 9873 (Part 1 to 9 - Mechanical, Flamm...
View Detailed Requirements
BIS Footwear Certification
QCO Enforced

BIS Certification for Footwear Products

Mandatory BIS ISI Mark certification for leather, canvas, rubber, PVC, sports, and safety footwear under footwear QCOs.

Timeline: 30 - 45 Working Days
Standards: IS 15844 (Sports Footwear), IS 15298 (Sa...
View Detailed Requirements

Product Testing Services

NABL testing for EMI/EMC, RF, IP Rating, LM-79 & LM-80, RoHS, and Lithium Batteries.

NABL Testing
ISO/IEC 17025

NABL Testing Coordination & Execution

Complete coordination of product safety, reliability, and conformance testing through premier NABL-accredited laboratories.

Timeline: 7 - 20 Working Days
Standards: Electronics, Mechanical, Chemical, Envir...
View Detailed Requirements
EMI-EMC Testing
Semi-Anechoic Lab

EMI-EMC Testing (Electromagnetic Compatibility)

Radiated and conducted emissions, immunity, ESD, surge, and burst testing in advanced semi-anechoic chambers.

Timeline: 7 - 12 Working Days
Standards: CISPR 22, CISPR 32, IEC 61000 Series, TE...
View Detailed Requirements
RF Testing
Wireless Conformance

RF Testing (Radio Frequency Conformance)

Radio frequency parameter testing including transmitter power, spectral mask, bandwidth, and spurious emissions.

Timeline: 5 - 10 Working Days
Standards: EN 300 328, EN 301 893, FCC Part 15, TEC...
View Detailed Requirements
IP Rating Testing
Water & Dust Proof

IP Rating Testing (Ingress Protection IP65/67/68)

Ingress protection testing verifying resistance to solid particles, dust, and water ingress up to immersion IP68.

Timeline: 3 - 7 Working Days
Standards: IS/IEC 60529 (IP00 to IP68), DIN 40050-9...
View Detailed Requirements
RoHS Approval
Green Compliance

RoHS Approval (Restriction of Hazardous Substances)

Screening and quantitative chemical testing for hazardous heavy metals and flame retardants (Lead, Cadmium, Mercury, CrVI, PBB, PBDE).

Timeline: 5 - 10 Working Days
Standards: IEC 62321, RoHS Directive 2011/65/EU, In...
View Detailed Requirements
LM-79 & LM-80 LED
Photometry

LM-79 & LM-80 (LED Luminaire & Package Testing)

Photometric and lumen maintenance testing for LED luminaires, packages, and drivers under IESNA standards.

Timeline: 7 - 15 Working Days (LM-79)
Standards: IES LM-79-08 (Photometry), IES LM-80 (Lu...
View Detailed Requirements
Battery Testing
EV & Electronics

Lithium-Ion Battery Safety & Performance Testing

Complete safety testing for Lithium-ion cells and battery packs under IS 16046 / IEC 62133 and AIS 156 / AIS 038 for EVs.

Timeline: 15 - 20 Working Days
Standards: IS 16046-2:2018, IEC 62133-2, AIS 156 / ...
View Detailed Requirements

Testing & Calibration Services

Precision calibration, measurement traceability, and testing laboratory services.

Testing & Calibration
Traceable Calibration

Testing and Calibration Laboratory Services

Complete testing and calibration services covering electrical, thermal, mechanical, pressure, optical, and dimensional instruments with national traceability.

Timeline: 3 - 7 Working Days
Standards: ISO/IEC 17025, NPL Traceability, Nationa...
View Detailed Requirements

Laboratory Set-up & Equipment

Turnkey testing lab setup consultancy, equipment selection, and test bench commissioning.

Lab Setup & Equipment
Turnkey Lab Setup

Testing Lab Setup Consultant & Lab Equipment

Turnkey consulting for in-house testing laboratory setup, equipment selection, installation, calibration, and BIS/NABL inspection readiness.

Timeline: 15 - 45 Working Days
Standards: BIS STI Requirements, NABL Accreditation...
View Detailed Requirements
ISO/IEC 17025 Consultancy
Laboratory Quality

ISO/IEC 17025 Consultancy for Testing & Calibration Labs

End-to-end consulting for establishing, implementing, and maintaining Quality Management Systems in compliance with ISO/IEC 17025.

Timeline: 30 - 60 Working Days
Standards: ISO/IEC 17025:2017 Competence of Testing...
View Detailed Requirements

Accreditation Support & Global Compliance

NABL Accreditation, ISO/IEC 17025, CE, CB/CBTL, DGCA, SASO, EU-CBAM & FDA compliance.

NABL Accreditation
National Accreditation

NABL Accreditation Support

Comprehensive handholding to achieve NABL accreditation in Testing, Calibration, and Medical testing laboratories.

Timeline: 60 - 90 Working Days
Standards: NABL 100 series, ISO/IEC 17025, ILAC Mut...
View Detailed Requirements
MNRE / ALMM Support
Solar Energy

MNRE / ALMM Support (Approved List of Models & Manufacturers)

Ministry of New and Renewable Energy (MNRE) enlistment under ALMM (Approved List of Models and Manufacturers) for Solar PV Modules.

Timeline: 45 - 60 Working Days
Standards: BIS IS 14286, IS/IEC 61215, IS/IEC 61730...
View Detailed Requirements
CB / CBTL Scheme
Worldwide Recognition

CB / CBTL Requirements (IECEE CB Scheme)

IECEE CB Scheme test certificates and test reports enabling global market acceptance across 50+ member countries.

Timeline: 20 - 35 Working Days
Standards: IEC Standards for IT, Audio/Video, Medic...
View Detailed Requirements
DGCA Drone Compliance
Aviation & Drones

DGCA Compliance (Drone & Aviation Approval)

Directorate General of Civil Aviation (DGCA) Type Certification and regulatory approvals for Unmanned Aircraft Systems (UAS / Drones).

Timeline: 30 - 60 Working Days
Standards: Drone Rules 2021, Quality Council of Ind...
View Detailed Requirements
SASO Compliance
Middle East Export

SASO Compliance (Saudi Arabia Export Certification)

Saudi Standards, Metrology and Quality Organization (SASO) compliance and SABER platform product & shipment certificate issuance.

Timeline: 7 - 15 Working Days
Standards: SASO Technical Regulations (G-Mark, IECE...
View Detailed Requirements
EU-CBAM Compliance
Carbon Border EU

EU-CBAM Compliance (Carbon Border Adjustment Mechanism)

Embedded greenhouse gas emission calculation, monitoring, reporting, and EU-CBAM portal filing for steel, aluminum, fertilizer, and cement exporters.

Timeline: 15 - 30 Working Days
Standards: EU Regulation 2023/956, CBAM Transition ...
View Detailed Requirements
CE Certification
European Union

CE Certification (European Conformity)

CE Marking compliance for the European Economic Area (EEA) covering LVD, EMC, Machinery, RoHS, and Medical Directives.

Timeline: 15 - 30 Working Days
Standards: Low Voltage Directive (LVD), EMC Directi...
View Detailed Requirements
US FDA Registration
United States

US FDA Registration & Device Listing

Establishment Registration, US Agent Representation, Device Listing, and 510(k) clearance guidance with the US Food and Drug Administration.

Timeline: 10 - 25 Working Days
Standards: US FDA 21 CFR Part 820 (QSR), 21 CFR Par...
View Detailed Requirements
RDSO Certification
Indian Railways

RDSO Certification (Indian Railways Vendor Approval)

Research Designs and Standards Organisation (RDSO) vendor registration and technical approval for supplying to Indian Railways.

Timeline: 60 - 90 Working Days
Standards: RDSO Specifications for Signaling, Elect...
View Detailed Requirements
WMI Registration
Automotive VIN

WMI Registration (World Manufacturer Identifier for Automotive)

World Manufacturer Identifier (WMI) code allocation for vehicle and automotive component manufacturers for Vehicle Identification Numbers (VIN).

Timeline: 15 - 25 Working Days
Standards: ISO 3780 / SAE Standards for VIN Generat...
View Detailed Requirements
Trademark Registration
Brand Protection

Trademark Registration & Intellectual Property

Trademark search, class classification, online filing, objection handling, and registration with the Controller General of Patents, Designs and Trade Marks.

Timeline: 1 - 3 Working Days (Filing)
Standards: Trade Marks Act 1999 (Classes 1 to 45)...
View Detailed Requirements
LMPC Registration
Weights & Measures

LMPC Registration (Legal Metrology Packaged Commodities)

Mandatory Legal Metrology Packaged Commodities (LMPC) importer and manufacturer registration under Rule 27 of Legal Metrology Rules.

Timeline: 10 - 15 Working Days
Standards: Legal Metrology Act 2009 & Packaged Comm...
View Detailed Requirements
Import Export License
DGFT Trade

Import Export License (IEC from DGFT)

Issuance and annual renewal of 10-digit Importer-Exporter Code (IEC) from Directorate General of Foreign Trade (DGFT).

Timeline: 1 - 3 Working Days
Standards: Foreign Trade Policy of India, DGFT Regu...
View Detailed Requirements
GeM Registration
Govt Tenders

GeM Registration (Government e-Marketplace)

Primary seller registration, OEM vendor assessment, catalog upload, and tender participation support on the Government e-Marketplace (GeM).

Timeline: 3 - 7 Working Days
Standards: GeM Portal Guidelines, Public Procuremen...
View Detailed Requirements
Make In India Mark
Public Procurement

Make in India Mark & Local Content Certification

Local value addition audits and issuance of Class-I / Class-II Local Supplier certificates under Public Procurement Preference to Make in India orders.

Timeline: 5 - 10 Working Days
Standards: DPIIT Public Procurement Order (PPO) 201...
View Detailed Requirements
MSME & NSIC Registration
Subsidies & Grants

MSME & NSIC Registration (Udyam & Single Point)

Udyam Registration and National Small Industries Corporation (NSIC) Single Point Registration for government tender fee exemptions and testing subsidies.

Timeline: 3 - 7 Working Days
Standards: MSMED Act 2006, NSIC SPRS Scheme...
View Detailed Requirements
Start-up Registration
Startup India

Start-up Registration (DPIIT Startup India)

DPIIT recognition under Startup India for fast-track patent/trademark filing, tax exemptions under Section 80-IAC, and relaxation in public procurement.

Timeline: 5 - 10 Working Days
Standards: DPIIT Startup India Guidelines...
View Detailed Requirements
NOC for Steel Importers
Ministry of Steel

NOC for Steel Importers (Ministry of Steel)

Clarification and No Objection Certificate (NOC) from Ministry of Steel for grades not manufactured in India or outside steel QCO scope.

Timeline: 15 - 30 Working Days
Standards: Steel and Steel Products (Quality Contro...
View Detailed Requirements
FSSAI Food License
Food Safety

FSSAI Registration & Food License

FSSAI Basic Registration, State License, and Central License for food business operators, importers, and food packaging manufacturers.

Timeline: 7 - 20 Working Days
Standards: Food Safety and Standards Act 2006 & Reg...
View Detailed Requirements
EPCG Scheme
Duty Free Imports

EPCG Scheme (Export Promotion Capital Goods)

Facilitating zero customs duty import of capital machinery for pre-production, production, and post-production under DGFT EPCG authorization.

Timeline: 15 - 25 Working Days
Standards: Foreign Trade Policy Chapter 5 (EPCG Sch...
View Detailed Requirements
TAC Approval & IMEI
Mobile & Telecom

TAC Approval & IMEI Registration (DoT EIR Portal)

Type Allocation Code (TAC) certificate verification and IMEI number batch registration on the Department of Telecommunications Central EIR portal.

Timeline: 3 - 7 Working Days
Standards: Prevention of Tampering of Mobile Device...
View Detailed Requirements

Don't See Your Specific Product Standard?

We cover more than 600+ Indian Standards (IS), international norms, and newly notified QCOs. Talk directly to our technical desk.